环境辐射水平调查结果
Monitoring information of environmental radioactivity level
MEXT:Ministry of Education, Culture, Sports, Science and Technology
  1. Home

Updates

May 15, 2012
Results of monitoring the environmental radioactivity level of fallout (preliminary) (No.139)(May 15, 2012) (Chinese version)
May 15, 2012
Readings of environmental monitoring sample (June 1, 2011 - May 15, 2012)(Chinese version)
May 15, 2012
Readings of soil monitoring (June 1, 2011 - May 15, 2012)(Chinese version)
May 15, 2012
Readings of dust sampling (June 1, 2011 - May 15, 2012)(Chinese version)
May 15, 2012
Estimated and measured 1m height environmental radioactivity level at monitoring posts in 47 prefectures(14:00 May 15, 2012)(Chinese version)

Sitemap

Important Information

各都道府县的监控(Monitoring by prefecture, Chinese)

福岛核电站周边的监控等(Monitoring, etc. around Fukushima NPP, Chinese)

Readings at Monitoring Post(Chinese Version)

Readings of dust sampling(includes Pu&U, strontium)(Chinese Version)

Airborne Monitoring(Chinese Version)

Readings of Sea Area Monitoring(Sea, Sea Water, Marine Soil)(Chinese Version)

Schools, etc.(Chinese Version)

Monitoring by Fukushima Prefecture, etc.(Chinese Version)

Monitoring around Fukushima NPP(by TEPCO)(Chinese Version)

Others(Chinese Version)

有关陆地检测点的经纬度等位置信息(Information on the Location including Lat/Long of the Reading Point, Chinese version)

Distribution map(Chinese Version)

Related Information(Chinese Version)

Contacts

Emergency Operation Center
Katou
Tel : 03-5253-4111 Ex.4604, 4605